Schedule
The programme now lives in eBinaa. Primavera was the source; it is no longer the system of record.
Data date 22 Feb 202789 activities27 WBS packages46 critical1 revision awaiting decision
89 of 89 shown
Activity
20262027
SepOctNovDecJanFebMarAprMayJunJulAugSepOctNov
1000Preliminaries
MS-001Project Start
PRE-100Mobilisation & Site Establishment
PRE-130Building Permit & Municipality Approvals
PRE-110Site Survey & Setting Out
PRE-120Temporary Facilities & Site Utilities
2000Excavation
EXC-100Site Clearance & Levelling
EXC-110Bulk Excavation
EXC-120Excavation for Footings
3000Substructure
SUB-100Blinding Concrete to Footings
STR-120Foundation Reinforcement
STR-130Foundation Formwork
SUB-140Foundation Concrete Pour
SUB-150Foundation Curing & Formwork Stripping
SUB-160Waterproofing & Protection to Foundations
SUB-170Backfilling & Compaction to Foundations
SUB-200Anti-Termite Treatment
SUB-210Ground Slab Hardcore & Blinding
SUB-220Ground Slab Reinforcement & Services
SUB-230Ground Slab Concrete Pour
MS-002Substructure Complete
4000Ground Floor Structure
STR-300GF Column Reinforcement
STR-310GF Column & Wall Formwork
STR-320GF Column Concrete Pour
STR-330GF Shear Walls & Staircase Core
STR-400FF Slab Formwork & Scaffolding
STR-410FF Slab Reinforcement
STR-420FF Slab MEP Conduits & Sleeves
STR-430FF Slab Concrete Pour
STR-440FF Slab Curing
STR-450FF Slab Formwork Stripping
MS-003Ground Floor Structure Complete
5000First Floor Structure
STR-500FF Column Reinforcement
STR-510FF Column & Wall Formwork
STR-520FF Column Concrete Pour
STR-530FF Shear Walls & Staircase
STR-600Roof Slab Formwork & Scaffolding
STR-610Roof Slab Reinforcement
STR-620Roof Slab MEP Conduits & Sleeves
STR-630Roof Slab Concrete Pour
STR-640Roof Slab Curing & Stripping
MS-004Superstructure Complete
6000Roofing
ROF-100Roof Screed to Falls
ROF-110Roof Waterproofing Membrane
ROF-120Roof Protection Screed & Tiling
ROF-130Parapet Coping & Roof Drainage
7000Blockwork
BLK-100GF External Blockwork
BLK-110GF Internal Blockwork
BLK-120FF External Blockwork
BLK-130FF Internal Blockwork
BLK-140Lintels, Bands & Openings
8000MEP First Fix
MEP-100GF Electrical Conduits & Boxes
MEP-200GF Water Supply Pipework
MEP-110FF Electrical Conduits & Boxes
MEP-210GF Drainage & Waste Pipework
MEP-220FF Water Supply & Drainage Pipework
MEP-120Main DB, Riser & Earthing Provisions
MEP-240MEP First Fix Inspection & Pressure Test
MS-005MEP First Fix Complete
9000Plastering
PLS-100GF Internal Plastering
PLS-110FF Internal Plastering
PLS-120External Plastering & Rendering
10000Waterproofing
WPF-100Wet Areas Waterproofing — Ground Floor
WPF-110Wet Areas Waterproofing — First Floor
WPF-120Waterproofing Flood Test & Sign-off
11000Tiles
TIL-100GF Floor Tiling
TIL-110FF Floor Tiling
TIL-120Wall Tiling to Wet Areas
12000Doors & Windows
DRW-100Aluminium Window & Glazing Installation
DRW-110Internal Door Frames
DRW-120Door Leaves & Ironmongery
13000MEP Second Fix
MEP-300Electrical Wiring & Accessories
MEP-320Sanitary Ware & Fittings Installation
MEP-310Light Fittings & Distribution Boards
MEP-330AC Units, Ducting & Grilles
14000Painting
PNT-100Internal Painting — Primer & First Coat
PNT-120External Painting
PNT-110Internal Painting — Final Coat
15000External Works
EXT-100Boundary Wall Foundation
EXT-200External Drainage, Manholes & Soakaway
EXT-110Boundary Wall Blockwork & Plaster
EXT-210Driveway, Paving & Kerbs
EXT-120Main Gate & Wicket Door Installation
16000Testing & Commissioning
TST-100Electrical Testing & Certification
TST-110Snagging Inspection
TST-120Snag Rectification
17000Handover
HND-110As-Built Drawings & O&M Manuals
HND-100Municipality Completion Certificate
HND-120Client Handover & Key Transfer
MS-006Practical Completion
BaselineContractor reportedConsultant verifiedCritical path Data date
Prototype note — Dates are imported, not calculated. There is no CPM engine in this prototype: total float and critical-path flags come from the baseline import, and editing a duration will not reschedule successors. The domain model and utils/gantt.ts are shaped so a real forward/backward pass can replace the mocks without touching the UI.